// Controllers · Mach3 / Mach4
CAM for Mach3 / Mach4
Many routers and mills, Avid CNC machines among them.
What the Mach3 / Mach4 post writes
- T<n> M6 then G43 H<n> (tool length from the tool table)
- Drilling cycles G81 / G82 / G83 / G73
- Helical arcs
- Dwell in seconds
Files end in .tap. Every file is read back before export and checked against the simulated toolpath.
Check the tool table holds a length for each tool number before the first job.
Not yet confirmed on a machine. This post follows the controller maker's documentation. Before the first real job, run the controller check in the air — or compare with a file that already runs on your machine (Export options → Check this post).